Asphalt calculator

A 12 × 40 ft driveway at 3 inches is 8.80 tons of hot mix (9.24 with 5% extra), or 4.44 cubic yards.

Length
Width
Thickness
Residential driveway surfaces are usually 2 to 3 inches of compacted asphalt over a compacted gravel base (Illinois Asphalt Pavement Association; HomeGuide).
Waste
5% extra is a common rule of thumb for uneven subgrade and edges. It is not a cited plant yield. Adjust to your site.
Gravel base
Optional compacted gravel under the asphalt. Tons use 1.40 tons per cubic yard. Open the gravel calculator for the base itself.

You need 9.24 tons (480.00 sq ft, 53.33 sq yd, 4.44 cubic yards).

Order about 9.24 tons of hot mix (8.80 before 5% extra), or 4.44 cubic yards.

Report a problem with this result
40 ft12 ft3 in deep
How we calculated this

40 ft × 12 ft = 480 square feet (53.33 square yards).

Tons = square yards × thickness in inches × 110 lb ÷ 2,000. 53.33 × 3 × 110 ÷ 2,000 = 8.8 tons. Kentucky Transportation Cabinet estimates 110 lb per square yard per inch of compacted hot-mix asphalt.

Cubic yards = area × (inches ÷ 12) ÷ 27 = 4.44 cubic yards.

5% extra for waste is a common rule of thumb: 9.24 tons to order.

Estimate cost (optional)

Typical US price: $40 to $80 per ton (HomeGuide (opens in a new tab), December 2025).

Sources

Typical prices are planning estimates from HomeGuide, December 2025. They are not a live quote.

Compacted hot-mix tons use 110 lb per square yard per inch: tons = square yards × thickness in inches × 110 ÷ 2,000. Kentucky Transportation Cabinet (state DOT) bid specification (opens in a new tab) (proposal addendum): “rate of application for all asphalt mixtures to be 110 lbs/sy per inch of depth.” Michigan Department of Transportation (state DOT) (opens in a new tab) treats 110 lb per square yard as about 1 inch of compacted HMA.

Residential driveway surfaces are usually 2 to 3 inches of compacted asphalt over a compacted gravel base. HomeGuide, Asphalt Driveway Cost (cost guide, Tara Farmer, May 28, 2025) (opens in a new tab): 2 to 3 inches over 6 to 8 inches of gravel. Illinois Asphalt Pavement Association (industry association) (opens in a new tab): 3 inches over 6 to 8 inches of aggregate, or 2 to 3 inches in two 1½ inch lifts. A note appears under 2 inches.

Optional gravel base uses 1.40 tons per cubic yard, the same cited gravel density as the gravel calculator (EPA dry gravel 1.35; New Mexico EMNRD 1.42). 5% extra for waste is a common rule of thumb, not a cited plant yield.

Hot-mix material $40–$80 per ton: HomeGuide, Asphalt Prices (cost guide, Sarah Noel, December 19, 2025) (opens in a new tab). That is mix only. Installed paving $5–$12+ per square foot and a 20 × 20 ft drive about $2,000–$4,800: the same HomeGuide driveway article (May 28, 2025). Angi (Timothy Moore, October 14, 2026) reports a national average of $5,350, most jobs $3,154–$7,556.

Asphalt calculator

A 12 × 40 ft driveway at 3 inches of compacted hot-mix asphalt is 8.80 tons, or 9.24 tons with 5% extra, and 4.44 cubic yards.

Measure length and width in feet. Set compacted thickness in inches. The page converts the area to square yards, then uses 110 lb per square yard per inch from a Kentucky Transportation Cabinet bid specification to get tons.

  1. Enter length and width. Add another area for a second rectangle or a circle.
  2. Keep thickness in inches. Three inches is the default residential surface. A note appears under 2 inches.
  3. Leave 5% extra unless your plant or contractor says otherwise. That extra is a common rule of thumb, not a cited yield.
  4. Optionally add a compacted gravel base. The tons use 1.40 tons per cubic yard. Open the gravel calculator for the base layer itself.
  5. Open Estimate cost and type a plant quote, or use HomeGuide’s $40–$80 per ton for hot-mix material (December 19, 2025). That band is mix only, not installed paving.

Tons = square yards × thickness in inches × 110 lb ÷ 2,000. Square yards = square feet ÷ 9. Cubic yards = square feet × (inches ÷ 12) ÷ 27.

How much asphalt do I need for a driveway?

Convert the driveway to square yards, then multiply by compacted thickness in inches and by 110 lb per square yard per inch, and divide by 2,000 to get tons. A 12 × 40 ft drive is 480 square feet, or 53.33 square yards. At 3 inches that is 53.33 × 3 × 110 ÷ 2,000 = 8.80 tons (4.44 cubic yards). Add a waste percent if the subgrade is uneven.

Worked example: 12 × 40 ft driveway at 3 inches

Worked example

Default job on this page: 12 ft by 40 ft, 3 inches compacted, 5% extra, no gravel base.

12 × 40 = 480 square feet. 480 ÷ 9 = 53.33 square yards. 53.33 × 3 × 110 ÷ 2,000 = 8.80 tons. Volume is 480 × (3 ÷ 12) ÷ 27 = 4.44 cubic yards. With 5% extra, order 9.24 tons.

At 2 inches the same area is 5.87 tons. A 4 inch gravel base under this drive is 5.93 cubic yards, or 8.30 tons at 1.40 tons per cubic yard.

Tons of hot mix for common driveways

DrivewayArea2 inches3 inches
10 × 20 ft200 sq ft (22.22 sq yd)2.44 tons3.67 tons
12 × 40 ft480 sq ft (53.33 sq yd)5.87 tons8.80 tons
20 × 20 ft400 sq ft (44.44 sq yd)4.89 tons7.33 tons
24 × 50 ft1,200 sq ft (133.33 sq yd)14.67 tons22.00 tons

These tons use 110 lb per square yard per inch and no waste. Add 5% on this page if you want a cushion. Installed price is not in the table; HomeGuide (May 28, 2025) puts a paved driveway at $5–$12+ per square foot.

Questions

How thick should an asphalt driveway be?
For cars, HomeGuide (May 28, 2025) uses 2 to 3 inches of compacted asphalt over 6 to 8 inches of compacted gravel. The Illinois Asphalt Pavement Association describes 3 inches of asphalt over 6 to 8 inches of aggregate, or 2 to 3 inches in two compacted lifts. This calculator defaults to 3 inches.
How much does an asphalt driveway cost?
HomeGuide (Tara Farmer, May 28, 2025) puts installed paving at $5–$12+ per square foot, or about $2,000–$4,800 for a 20 × 20 ft drive. Angi (Timothy Moore, October 14, 2026) reports a national average of $5,350, with most jobs $3,154–$7,556. Hot-mix material only is $40–$80 per ton (HomeGuide, Sarah Noel, December 19, 2025). Delivery and labor are extra.
How long does an asphalt driveway last?
HomeGuide (May 28, 2025) lists 15 to 30 years with proper installation and maintenance, and notes that freeze-thaw and heavy rain shorten that band. Concrete on the same comparison table is 30 to 40 years. Sealcoating and crack repair are part of keeping an asphalt surface in that range.
How long before you can drive on a new asphalt driveway?
HomeGuide (May 28, 2025) says wait at least 24 to 48 hours before driving or parking, 3 to 5 days in hot weather if you can, and about a week for heavy vehicles so tires do not leave marks. Follow the paver’s written release; mix temperature and weather change the wait.
Is asphalt cheaper than concrete for a driveway?
Up front, usually yes, with overlap. HomeGuide’s asphalt-versus-concrete table (2026) lists asphalt at $5–$12 per square foot installed and concrete at $6–$15, with asphalt at 15–30 years and concrete at 30–40 years. Compare local bids on the same thickness and base. Size a concrete slab with the concrete calculator.
Is 2 inches of asphalt enough for a driveway?
Two inches is the low end of the 2 to 3 inch residential surface band HomeGuide and the Illinois Asphalt Pavement Association cite. IAPA’s gravel-base option for a new drive is 3 inches of asphalt over 6 to 8 inches of aggregate. This page flags thickness under 2 inches.

Written by The BuildMath team. Formulas tested against worked examples. Updated October 24, 2026.